Latest articles and insights from EstimateNext
Data center construction spending rocketed 28% last year, but tight margins and massive BOQs create headaches for estimators. Here's how AI tools can help.
Six ConTech startups just raised $121M. But the real story is how AI-powered estimation tools are reshaping preconstruction workflows. Here's why speed matters.
Manual drawing takeoffs waste 40 hours per project — AI tools like EstimateNext cut that to just 10 minutes. The math isn’t just impressive; it’s essential for staying competitive in today’s construction market.
Still flipping through 2,000-page rate books? AI-powered rate matching can save 12 hours per estimate. Here’s how it works (and why it matters).
Flipping through 2,000-page rate books wastes 36 hours per bid. AI rate matching cuts that to seconds. Here's how it works and why it matters.
Subcontractor bid leveling is a time sink — six hours or more per bid. AI-powered tools like EstimateNext cut it down to just 30 minutes. Here's how.
Manual drawing takeoffs waste 40 hours per project — AI tools like EstimateNext cut this to 10 minutes. Here's how it works and why it matters.
Manual sub bid leveling eats up 120 hours per bid. AI-powered tools slash that to 30 minutes. Here's how it works and why it matters.
The winning JV didn't take the $711M Hudson Tunnel Project on gut feel. Speed, accuracy, and AI-driven insights made the difference. Here's why manual workflows can't keep up.
Manual drawing takeoffs waste 40 hours per bid. AI tools cut this to 10 minutes, saving thousands in labor costs. Here's how it works.
The $3.5B California High-Speed Rail JV isn't just a megaproject—it's a case study in how slow, manual estimation processes can derail even the best bids. Here's where AI fits in.
Turner-Consigli’s $2.3B NYC Cancer Center isn’t just a construction marvel—it’s a cost estimation masterclass. Here’s how AI tools can solve the most brutal bottlenecks.
AI-powered rate matching across 78,000+ items. Free tier, no credit card.